|
Position of Advertising HaNoi-LangSon |
|
|
|
|
Tuesday, 24 July 2007 |
 |
- Position : New 1A highway Bac Ninh, near overpass go to Pha Lai
- Position Description: This is main road from Ha Noi, hai Phong go to Bac Ninh, Bac Giang and Lang Son
|
|

Detail:
- Position : New 1A highway Bac Ninh, near overpass go to Pha Lai
- Position Description: This is main road from Ha Noi, hai Phong go to Bac Ninh, Bac Giang and Lang Son., the distance to advertising Mobifone : 200m, to overpass : 1km , to Ha Noi City : 34km – crownded area then it is very effective especially in outside advertising with wide range of view.
- Board status: Available
- Traffic rate: About 40,000 person/ vehicle/ day/
- Range of view: 100m -1500m
- Size : (Heigh) 7m x (Width) 20m, sides : 2. Total square metres = 280m2 (14m above the land).
- Advertising Material: High quality Hi- Flex.
- Price (VAT 10%) : Contact us
- Completing Time : 15 days after signing contract and paying the 1st advance
- Lighting time: From 18:00 to 22:00
Thank you for your coorperation./.
Please contact us via the following address for further detail
Contact us:
Advertising Center II:
No 9 Dinh Le Street, Hoan Kiem, Hanoi
- Tel : (04) 8.252991, 9.343622, 8.266262
- Fax : (04) 9.341582
- Email :
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
- Mb : 0913217848
|
|